CLOUD & IT INFRASTRUCTURE SERVICES
Enterprise Monitoring
Avalon makes an agency's IT problems visible to the agency before they become visible to its users, its Inspector General, or Congress.
Avalon consolidates fragmented monitoring and logging tools into one accurate picture of system health and a log pipeline sized to the new OMB M-26-14 federal baseline, delivered by senior engineers in weeks.
- Readiness Assessment Alone
- 3–5 wks
- Bureau-Level Implementation
- 12–20 wks
- New OMB M-26-14 Log Retention Baseline
- 6 mo
- Federal Frameworks Addressed
- 5
THE PROBLEM & THE APPROACH
If your help desk finds outages before your tools do, you have a coverage problem.
The Challenge
Our Approach
Mission systems fail silently, when the first outage signal is a help desk ticket, mean time to detect is measured in user frustration, and for mission-critical services that lag is a mission failure.
Avalon designs and implements the target monitoring architecture, then builds the dashboards, alerts, and runbooks that turn raw telemetry into operational action before users notice.
OMB M-26-14 rescinded M-21-31 in May 2026 and set new continuous event monitoring and threat-hunting objectives, a five-element maturity model, and a six-month searchable log-retention baseline, every agency CISO now owns a deliverable on a clock.
The readiness assessment baselines your log collection, retention, and searchability against the M-26-14 minimum baseline and maturity model, with a crosswalk from any legacy M-21-31 plan you already built.
Agencies commonly pay for four to eight overlapping monitoring products at partial deployment each, sized to a retention rule OMB itself now calls neither operationally feasible nor cost-effective.
A target architecture rationalizes which platforms stay, which retire, and how ingest and retention are sized, one of the few IT projects that can fund itself.
Cloud migrations routinely complete without monitoring parity, the team that understood the data center has no equivalent visibility into the cloud workloads that replaced it.
Every Cloud Migration, Architecture, Data Center, or SaaS/IaaS engagement in Avalon's catalog closes with the question 'who is watching this now,' and this service answers it.
- OMB M-26-14
- NIST SP 800-53 Rev 5 (AU family, CA-7, SI-4)
- NIST SP 800-137
- CISA Zero Trust Maturity Model
- FedRAMP-authorized platforms
CORE CAPABILITIES
From a readiness assessment to tuned, operational dashboards.
Readiness Assessment & Rationalization
A coverage and maturity gap analysis against the M-26-14 baseline, followed by a target architecture that consolidates the tool sprawl the assessment finds.
- Tool and license inventory against actual telemetry coverage
- Alert-quality sampling and M-26-14 maturity gap analysis
- Target architecture: platforms, ingest sizing, retention tiers
- Prioritized, costed remediation roadmap
Coverage Gap Sweep Platform Implementation
Vendor-neutral deployment and configuration of the log management, infrastructure, and application performance monitoring tools your environment needs.
- Splunk, Elastic, Microsoft Sentinel/Azure Monitor, or open-source stacks
- Agent and collector rollout through your change process
- Log source onboarding against an agreed source matrix
- Dashboards, alert definitions, and SLO/SLI baselines
Consolidated Log Platform Operationalization & Optional Retainer
Alert tuning, training, and documentation handoff, with an optional business-hours managed monitoring retainer.
- Alert tuning cycles to raise the actionable-alert ratio
- Runbooks for the top recurring alert scenarios
- Training and knowledge transfer to agency staff
- Optional managed monitoring under a monthly retainer
Tuned Alert Feed
OUR PROCESS
A bureau-level engagement runs 12-20 weeks; the assessment alone runs 3-5 weeks.
Kickoff & Access
Accounts, tool administrative access, and a data call for asset and tool inventories. (1-2 weeks)
Assess & Baseline
Tool and license inventory, coverage mapping, alert-quality sampling, and the M-26-14 baseline and maturity gap analysis. (2-4 weeks)
Design
Target architecture, consolidation decisions, ingest sizing, and change-board approval of the deployment plan. (2-3 weeks)
Implement
Pilot enclave first, then phased rollout of agents, collectors, and source onboarding across the environment. (4-10 weeks)
Operationalize
Alert tuning cycles, dashboard finalization, runbook authoring, and training against SLO baselines. (2-4 weeks)
Closeout / Transition
Configuration and documentation handoff to agency operations, or the start of a managed retainer. (1-2 weeks)
WHY AVALON
Every architecture decision carries an ingest-and-retention cost model.
5
Federal Frameworks Addressed
Compliance-First, Cost-Aware Delivery
Most monitoring boutiques are platform practices, excellent at one vendor's stack, thin on the federal compliance layer. Avalon pairs M-26-14 baseline mapping with the cost lens inherited from its FinOps practice.
Weeks, Not Quarters
An assessment lands in under five weeks and an implementation in a quarter, against an integrator's mobilization-heavy timeline.
No Conflicted Incentives
Avalon has no platform resale margin and no O&M body-shop to grow, so the consolidation recommendation is clean, unlike an incumbent grading its own monitoring.
Vendor Neutrality
Platform selection follows your installed base and license economics, not a reseller incentive.
Fixed-Fee, HUBZone-Friendly Entry
An under-SAT readiness assessment is fast to award and reliably surfaces the follow-on implementation and retainer.
Resource Library
Enterprise Monitoring, Ready To Download.
Many agencies still learn about outages from help desk tickets. See how consolidated monitoring and logging meet OMB M-26-14 and surface failures first.
White Paper · Start here
Enterprise Monitoring: See It First, Prove It After
How a readiness assessment and a focused consolidation give agencies fewer monitoring tools, alerts people act on, and logging that fits their OMB M-26-14 plan.
15 pages · PDFDownloadCapability Overview
Enterprise Monitoring Service Overview
Making an agency's IT problems visible to the agency before they become visible to its users, its Inspector General or Congress.
1 page · PDFDownloadTechnical Briefs · 3
Engineering detail for architects, ISSOs and program offices.
FREQUENTLY ASKED
Questions, Answered.
Straight answers about coverage, compliance, and what this service will and won't get you.
Talk to Our Team →5
Federal Frameworks Addressed
- OMB M-26-14
- NIST SP 800-137
- NIST SP 800-53 Rev 5
- CISA Zero Trust Maturity Model
Owning the tool and having the capability are different facts. The assessment quantifies the gap between what the licenses cost and what is actually onboarded, tuned, and retained, and in most environments that gap is where both the outages and the audit findings live.
Then the prime is grading its own homework on availability. A bounded, independent consolidation or assessment task order doesn't disturb the O&M contract, it gives you an unconflicted read on whether the monitoring the incumbent operates actually covers the environment.
No. This engagement implements the log collection, retention, and searchability capabilities the M-26-14 minimum baseline requires and produces the coverage and maturity evidence your agency needs for its logging plan and FISMA reporting. Your plan submission and the compliance determination remain the agency's.
The telemetry pipeline serves both sides of the house, but this engagement is infrastructure and operations: coverage, availability, retention, and the M-26-14 baseline. The SOC's detection content and hunting are separate services, the cleanest logging plans are the ones where operations builds the pipeline and security consumes it.
Waiting is the expensive option. The inventory, coverage mapping, and cost baseline are prerequisites for responding to the LRA no matter what it says, and your agency's plan is due 90 days after it publishes. The assessment is exactly the work that makes the LRA actionable on day one.
Correct, and Avalon leads with that fact rather than burying it. What transfers: the firm's cloud and FinOps delivery record, founder-level platform depth, and a fixed-price entry engagement small enough that your risk is capped at one assessment fee.
Not today. Avalon offers business-hours managed monitoring under a monthly retainer; 24x7 NOC-style coverage requires shift staffing Avalon doesn't yet hold, and we say so plainly rather than overpromise.
Ready to see problems before your users or your IG does?
Talk to Avalon about scoping a monitoring and logging readiness assessment for your environment.
Related insights
- White PaperEnterprise Monitoring: See It First, Prove It AfterHow a readiness assessment and a focused consolidation give agencies fewer monitoring tools, alerts people act on, and logging that fits their OMB M-26-14 plan.
- Technical BriefThe Shared Services Cost Data GAO Wants GSA to CollectGAO found that GSA lacks comprehensive data on how well federal shared services meet agency needs, and made a revised data collection plan, cost data included, a priority recommendation. Four of eight agencies GAO surveyed said they lacked the data to choose a provider.
- Technical Brief5 of 6 Agencies Report Restrictive Cloud Licensing ImpactsIn November 2024, GAO found that five of six selected agencies reported restrictive software licensing practices affecting their cloud efforts. VA and DoW each have open recommendations to issue guidance for identifying, analyzing, and mitigating them.
- ArticleAuthorization Through the Move: A Compliance Roadmap for Defense Cloud MigrationA migration changes the system boundary, so the agency will reassess and reauthorize. This roadmap sets the compliance output of each phase, maps the control families the migration produces evidence for, and names what still sits with the assessor and the Authorizing Official.
- ArticleWave-Based Cloud Migration: Dispositions, Landing Zones, and Reversible CutoversFederal migrations rarely fail on the target architecture. They fail on scope that drifts mid-wave, data that takes longer than the servers, and cutovers with no rehearsed way back. Here is the engineering sequence that controls all three.