CLOUD & IT INFRASTRUCTURE SERVICES
Cloud Migration & Development
Avalon moves our systems out of the data center and into an authorized cloud environment on a fixed-price, wave-by-wave plan, cutting what we spend keeping old infrastructure alive and clearing the path to our own ATO without disrupting the mission.
Avalon relocates your applications and data into a modern, government-authorized cloud platform and performs the code remediation, database conversion, and integration work that makes them actually run once they get there.
- Small Portfolio Migration
- 4–6 mo
- “7 Rs” Disposition Strategies
- 7
- Federal Frameworks Addressed
- 5
- Process Phases, Kickoff to Closeout
- 6
THE PROBLEM & THE APPROACH
Legacy infrastructure is a budget problem before it's a mission problem.
The Challenge
Our Approach
O&M consumes the bulk of the IT budget, and hardware refresh cycles or licensing repricing shocks, the VMware/Broadcom renewal shock is the current archetype, produce sudden, unbudgeted six- and seven-figure bills.
Avalon dispositions every application using the '7 Rs' framework before migrating anything, retiring and repurchasing where that's the right call instead of lifting and shifting technical debt at cloud prices.
Fragile systems with single points of failure and no disaster recovery, running on hardware past end of support, carry outage risk for beneficiary-facing and warfighter-facing services.
Migration executes in controlled waves grouped by dependency and risk, with rehearsed cutover, rollback plans, and a defined hypercare window before operational handoff.
Zero trust architectures, modern logging, and continuous monitoring are difficult or impossible to implement on legacy platforms, and audit findings accumulate against systems that cannot be patched or instrumented.
Security documentation is produced throughout, control-implementation evidence and configuration baselines packaged so your ISSO and assessors can use them directly, not reconstructed after the fact.
The workforce that understands these systems is retiring or has left, and federal workforce reductions in 2025-2026 made people-intensive legacy operations even harder to sustain.
Senior migration engineers do the actual work in fixed-price waves that reward finishing, not staff augmentation that rewards duration.
- FISMA / NIST RMF (SP 800-37)
- NIST SP 800-53 Rev 5
- FedRAMP-certified environments
- DoD Cloud Computing SRG
- Zero Trust (EO 14028 / OMB M-22-09)
CORE CAPABILITIES
From portfolio discovery to a validated, secured, operating environment.
Portfolio Discovery & Disposition
Automated and interview-based inventory of every application, server, and dependency, assigned one of the '7 Rs' migration strategies and signed off by the agency.
- Application, server, database, and dependency mapping
- Licensing and data-sensitivity (CUI, PII, PHI) identification
- Disposition: rehost, replatform, refactor, repurchase, retire, retain, relocate
- A signed disposition list as the engagement's scope-control backbone
Signed Disposition List Wave-Based Migration Execution
Landing zone validation or build, followed by dependency- and risk-sequenced migration waves with real code remediation.
- Landing zone build or validation as infrastructure-as-code
- Rehosting, replatforming, and targeted refactoring per disposition
- Database migration, schema conversion, and reconciliation testing
- Code remediation, containerization, and integration rework
Sequenced Migration Wave Cutover, Validation & Evidence
Rehearsed cutover with rollback plans, functional validation, and security documentation packaged for direct use in your authorization process.
- Rehearsed cutover with rollback plans and hypercare
- Functional and performance validation against acceptance criteria
- Control-implementation evidence for your SSP and assessors
- Knowledge transfer and as-built architecture documentation
Hypercare Evidence Ledger
OUR PROCESS
A small portfolio runs 4-6 months; a mid portfolio runs 6-12 months.
Kickoff & Access
Accounts, network access, security paperwork, and a data call issued across the portfolio. (1-2 weeks)
Discovery & Assessment
Inventory, dependency mapping, disposition workshops, and sensitivity classification for every application in scope. (3-6 weeks)
Planning & Landing Zone
Wave plan, target architecture validation or build, and migration runbook templates. (4-8 weeks, overlaps discovery)
Pilot Wave
One to three low-risk applications migrated end to end to prove the pattern and calibrate estimates. (4-6 weeks)
Production Waves & Cutover
Remaining waves executed in sequence with remediation development running in parallel, each with rehearsed cutover and hypercare. (8-24+ weeks, portfolio-dependent)
Closeout & Transition
As-builts, the security evidence package, knowledge transfer, and decommission support for source infrastructure. (2-3 weeks)
WHY AVALON
Your incumbent gets paid more the longer your data center lives. We get paid for emptying it.
5
Federal Frameworks Addressed
Fixed-Price-Per-Wave, Not Time-and-Materials
Large-integrator migration work is typically staffed as a pyramid billed T&M, which rewards duration. Avalon prices FFP per wave, which rewards finishing, and puts founder-level engineers on the actual work.
Mobilization in Weeks
Not a staffing quarter. Materially lower blended rates than a large systems integrator, with the same senior engineers scoping and delivering the work.
Evidence-Native Delivery
The same team writes infrastructure-as-code and produces 800-53-mapped control evidence, so your authorization work starts the day migration ends, not months later.
Disposition Discipline
Every application is retired and repurchased before it's migrated, avoiding the lift-and-shift pattern that pays cloud premiums for data-center-shaped infrastructure.
HUBZone and Small-Business Credit
A direct award or HUBZone set-aside advances your agency's small-business goals while cutting procurement lead time.
Resource Library
Cloud Migration, Ready To Download.
Most legacy budget goes to keeping the lights on. See how wave-based, fixed-scope migration moves workloads into an authorized cloud and fixes code where needed.
White Paper · Start here
Cloud Migration & Development: Out of the Data Center, On Schedule
How federal agencies can move existing applications into a FedRAMP-certified cloud environment on a fixed-price, wave-by-wave plan, with control evidence mapped to NIST SP 800-53 and an illustrative five-year cost model.
29 pages · PDFDownloadCapability Overview
Cloud Migration & Development Service Overview
Moving systems out of the data center and into an authorized cloud environment on a fixed-price, wave-by-wave plan without disrupting the mission.
1 page · PDFDownloadTechnical Brief
15 of 24 Agencies Say an Outdated FAR Slows Cloud Buys
GAO reported in June 2026 that 15 of 24 CFO Act agencies said outdated FAR provisions impeded cloud procurements. The FAR still has no cloud definition, and GAO put the fix to Congress, so bidders have to write the definition into their own offers.
3 pages · PDFDownload
FREQUENTLY ASKED
Questions, Answered.
Straight answers about cost, risk, and what a migration with Avalon actually looks like.
Talk to Our Team →5
Federal Frameworks Addressed
- NIST SP 800-53 Rev 5
- FedRAMP-certified environments
- DoD Cloud Computing SRG
- Zero Trust (OMB M-22-09)
Sometimes true, when everything is lifted and shifted with no dispositions, no rightsizing, and no governance. That's a delivery failure, not a property of cloud. Our disposition process retires and repurchases before it migrates, and we put both TCO models side by side in the assessment before you commit to a single wave.
The environments we target hold FedRAMP certification and, for DoD, DISA impact-level authorizations, and we map every customer-responsibility control and hand you the evidence. The real risk isn't the cloud platform, it's an undocumented migration, which is exactly what our delivery model prevents.
We size honestly and deliver in waves, telling you in writing how many concurrent waves we can staff. What you get in exchange for a smaller firm is senior engineers actually doing the work, not a bench of first-year staff under a distant architect. If your portfolio genuinely needs a much larger program, we'll say so.
Ask why they haven't already done it, the incumbent operating your infrastructure earns revenue from its continued existence, while a migration firm earns revenue from its retirement. Our fixed-price-per-wave contract aligns payment with decommissioned systems, not billed hours.
No. Avalon migrates the system into a FedRAMP-certified environment and delivers control-implementation evidence mapped to NIST SP 800-53, reducing the documentation lift for your assessment. The independent control assessment and your Authorizing Official's decision remain separate, government-owned steps.
Workload placement follows your data and enterprise environment, not our preference. Everything we build ships as infrastructure-as-code you own, which is the practical form of exit-readiness.
Most stalls trace to three causes: no disposition discipline, no dedicated remediation developers, or agency-side access and testing bottlenecks nobody scheduled. The assessment names which of the three killed the last attempt, and the SOW assigns dates to the government-furnished items so it can't quietly happen again.
Ready to leave the data center on a fixed-price, wave-by-wave plan?
Talk to Avalon about scoping an application portfolio assessment and migration plan.
Related insights
- White PaperCloud Migration & Development: Out of the Data Center, On ScheduleHow federal agencies can move existing applications into a FedRAMP-certified cloud environment on a fixed-price, wave-by-wave plan, with control evidence mapped to NIST SP 800-53 and an illustrative five-year cost model.
- Technical BriefThe Shared Services Cost Data GAO Wants GSA to CollectGAO found that GSA lacks comprehensive data on how well federal shared services meet agency needs, and made a revised data collection plan, cost data included, a priority recommendation. Four of eight agencies GAO surveyed said they lacked the data to choose a provider.
- Technical Brief5 of 6 Agencies Report Restrictive Cloud Licensing ImpactsIn November 2024, GAO found that five of six selected agencies reported restrictive software licensing practices affecting their cloud efforts. VA and DoW each have open recommendations to issue guidance for identifying, analyzing, and mitigating them.
- ArticleAuthorization Through the Move: A Compliance Roadmap for Defense Cloud MigrationA migration changes the system boundary, so the agency will reassess and reauthorize. This roadmap sets the compliance output of each phase, maps the control families the migration produces evidence for, and names what still sits with the assessor and the Authorizing Official.
- ArticleWave-Based Cloud Migration: Dispositions, Landing Zones, and Reversible CutoversFederal migrations rarely fail on the target architecture. They fail on scope that drifts mid-wave, data that takes longer than the servers, and cutovers with no rehearsed way back. Here is the engineering sequence that controls all three.