CLOUD & IT INFRASTRUCTURE SERVICES
Gov Shared Cloud Services
Avalon gets your program productive inside the government cloud you've already been directed to use, faster than the platform's own intake queue, with the compliance documentation done right the first time.
Avalon guides a specific federal program through onboarding to a shared government cloud platform, evaluating fit, executing the intake process, configuring the tenant, and documenting exactly which security responsibilities the platform carries versus which remain with the program.
- Standalone Onboarding Sprint
- 3–6 wks
- Core Capability Areas
- 3
- Federal Frameworks Addressed
- 5
- Process Phases, Fit to Handoff
- 4
THE PROBLEM & THE APPROACH
The platform has an ATO. Your system still doesn't.
The Challenge
Our Approach
Mission owners routinely assume 'the platform has an ATO, so we're covered', but the mission system still requires its own authorization, and undocumented inheritance reads as unmet controls at assessment time.
Avalon produces a Control Inheritance Workbook that reconciles the platform's authorization against your NIST SP 800-53 control set, control by control, in a format your ISSO can lift directly into the SSP.
A system stuck on aging on-premises infrastructure, or waiting months in a platform onboarding queue, cannot deliver capability, and directed-migration deadlines slip while the program eats the blame.
Avalon drives the platform's intake process end to end, sponsor and funding coordination, account requests, impact-level determination, submitted correctly the first time so you don't lose your place in the queue.
Programs that bypass the shared environment and stand up bespoke cloud accounts pay twice: once for duplicative engineering, again when an IG or FinOps review flags the duplication.
Avalon evaluates candidate shared environments against impact-level support, inherited controls, cost model, and onboarding lead time, then recommends a destination with a decision record you can defend.
A tenant environment configured against the platform's guardrails instead of within them breaks at the next platform update, creating outages and findings later.
Tenant landing-zone configuration is built inside the platform's own guardrails, with logging and monitoring hooked to the platform or agency SOC and infrastructure-as-code the program's staff can maintain.
- FedRAMP (Rev 5 and 20x)
- DoD Cloud Computing SRG
- NIST SP 800-53 Rev 5 / RMF
- DoD Secure Cloud Computing Architecture
- ICAM policy (OMB M-19-17)
CORE CAPABILITIES
From platform fit to a documented, tenant-ready environment.
Platform Fit & Onboarding Execution
Scoring candidate shared environments against your workload's needs, then driving every intake form the platform requires.
- Workload and data-type inventory against candidate environments
- Scoring on impact level, inherited controls, cost, and lead time
- Sponsor and funding coordination (MIPR or interagency agreement)
- Impact-level determination and CSP region selection support
Platform Fit Scoring Tenant Configuration
Landing-zone configuration built inside the platform's guardrails, with connectivity and identity federation engineered for compliance by construction.
- Account structure and network segmentation within the enclave
- Cloud Access Point / SCCA connectivity for DoD, TIC 3.0 for civilian
- Identity federation (CAC/PIV, agency ICAM, FedRAMP-authorized IdP)
- Baseline infrastructure-as-code using platform-provided modules
Guardrailed Tenant Control Inheritance & Governance
A Customer Responsibility Matrix reconciliation and governance model that your ISSO can carry straight into the authorization package.
- Control-by-control inheritance mapping to NIST SP 800-53
- Consumption and chargeback/showback model
- Service-request runbook and roles-and-permissions model
- Exit and portability notes plus knowledge-transfer session
Inherited Control Ledger
OUR PROCESS
A standalone sprint runs three to six weeks.
Platform Fit & Selection
Workload and data-type inventory scored against candidate shared environments, ending in a decision record you can defend. (Weeks 1-2)
Onboarding Execution
Sponsor and funding coordination, account and enclave requests, and every intake artifact submitted correctly the first time. (Weeks 2-4)
Tenant Configuration & Inheritance Mapping
Landing-zone configuration inside the platform's guardrails, plus the Control Inheritance Workbook reconciled to your control set. (Weeks 3-5)
Governance & Handoff
Consumption model, service-request runbook, and a working-session knowledge transfer to program staff. (Week 6)
WHY AVALON
Avalon works only for you, the platform team works for the platform.
5
Federal Frameworks Addressed
The Mission Owner's Side of the Table
Platform operators hold billion-dollar enterprise-scale contracts shaped for the platform PMO, not for a single program's tenant, identity, and inheritance needs, and advising individual tenants they're obligated to serve neutrally raises OCI questions Avalon never has to answer.
Inheritance Rigor
The Control Inheritance Workbook is built control by control against NIST SP 800-53 in SSP-ready form, not a paragraph of 'the platform covers most security.'
In-House Adjacency
The same firm can carry the artifact forward into SSP development and ATO facilitation without a handoff.
Audit-Grade Documentation Culture
Every recommendation ships with a decision record, carried over from Avalon's forensic FinOps practice.
Fixed Fee, Fixed Timeline
Founder-led delivery in weeks, at a component-sized scope large systems integrators structurally decline to price aggressively.
Resource Library
Gov-Shared Cloud, Ready To Download.
Landing on Cloud One, cArmy, JWCC or cloud.gov still takes funding, security and identity work. See how to document what the platform covers and what you still own.
White Paper · Start here
Gov-Shared Cloud Services: Onboard Once, Inherit Correctly
How a federal program gets productive inside a government shared cloud such as Cloud One, cArmy, a JWCC task order or cloud.gov: platform selection, onboarding, tenant configuration, and a control inheritance workbook built for the SSP.
24 pages · PDFDownloadCapability Overview
Gov Shared Cloud Services Service Overview
Getting your program productive inside the government cloud you have been directed to use, with inheritance documented so controls read as met at assessment.
1 page · PDFDownloadTechnical Briefs · 2
Engineering detail for architects, ISSOs and program offices.
FREQUENTLY ASKED
Questions, Answered.
Straight answers about inheritance, cost, and what onboarding to a shared platform actually requires.
Talk to Our Team →5
Federal Frameworks Addressed
- FedRAMP (Rev 5 and 20x)
- NIST SP 800-53 Rev 5
- DoD Cloud Computing SRG
- DoD Secure Cloud Computing Architecture
The platform PMO onboards at portfolio scale, intake forms, an account, a wiki. The program-specific work, your identity federation, your network path, your control inheritance documented for your assessor, is exactly what the intake queue doesn't provide.
The platform's authorization covers the platform. Your system still needs its own, and every control you claim to inherit must be documented or your assessor treats it as unmet. That documentation is the deliverable.
They work for the platform office, scoped to enterprise services, and your program would be competing for attention inside a very large book of business, with an OCI question attached when the platform's operator starts advising individual tenants. Avalon works only for you.
Both are accurate today, and the engagement is priced accordingly: this is a component-sized, fixed-fee, short-duration engagement, the lowest-risk way to evaluate a new vendor. Key-personnel certifications and a written methodology stand in for corporate CPARS at this size.
You can, and programs that do usually meet Avalon later through an IG finding or a FinOps review. Bespoke accounts outside the enterprise environment mean paying twice and defending the duplication.
No. This service ends at a tenant-ready state against a written acceptance checklist. Moving and modernizing the workloads themselves is Cloud Migration & Development, scoped and priced separately.
A standalone Shared Cloud Fit Assessment & Onboarding Sprint runs three to six weeks. Duration scales with impact level and enclave count far more than with agency size, an IL5 enclave with SCCA connectivity work runs weeks longer than a civilian FedRAMP Moderate tenant.
Ready to get your program productive inside your directed cloud environment?
Talk to Avalon about scoping a Shared Cloud Fit Assessment & Onboarding Sprint.
Related insights
- White PaperGov-Shared Cloud Services: Onboard Once, Inherit CorrectlyHow a federal program gets productive inside a government shared cloud such as Cloud One, cArmy, a JWCC task order or cloud.gov: platform selection, onboarding, tenant configuration, and a control inheritance workbook built for the SSP.
- Technical BriefThe Shared Services Cost Data GAO Wants GSA to CollectGAO found that GSA lacks comprehensive data on how well federal shared services meet agency needs, and made a revised data collection plan, cost data included, a priority recommendation. Four of eight agencies GAO surveyed said they lacked the data to choose a provider.
- Technical Brief5 of 6 Agencies Report Restrictive Cloud Licensing ImpactsIn November 2024, GAO found that five of six selected agencies reported restrictive software licensing practices affecting their cloud efforts. VA and DoW each have open recommendations to issue guidance for identifying, analyzing, and mitigating them.
- ArticleAuthorization Through the Move: A Compliance Roadmap for Defense Cloud MigrationA migration changes the system boundary, so the agency will reassess and reauthorize. This roadmap sets the compliance output of each phase, maps the control families the migration produces evidence for, and names what still sits with the assessor and the Authorizing Official.
- ArticleWave-Based Cloud Migration: Dispositions, Landing Zones, and Reversible CutoversFederal migrations rarely fail on the target architecture. They fail on scope that drifts mid-wave, data that takes longer than the servers, and cutovers with no rehearsed way back. Here is the engineering sequence that controls all three.